
Documents Reveal The Boring Company Studied a Music City Loop Tunnel Beneath the Cumberland to Nissan Stadium
A LOOP Nashville review of the project’s 2025 environmental assessment found a mapped Broadway alignment extending from Centennial Park to the East Bank, including a specific Cumberland River crossing that engineers evaluated with roughly 25 feet of rock above the tunnel crown. The crossing is absent from The Boring Company’s current public route description.
Read it

