
Music City Loop Plans BNA Station Steps From Terminal Entrance
Newly reported plans place the airport station in the current taxi and limousine pickup area. Airport officials say the final agreement remains unsigned.
Read it
Stay in the Loop News, public records, maps, milestones, and clear-eyed analysis of the proposed Music City Loop.
LATEST DISPATCHES

Newly reported plans place the airport station in the current taxi and limousine pickup area. Airport officials say the final agreement remains unsigned.
Read itMetro engineering filings show a major excavation in SoBro. A LOOP Nashville review of state drawings and the project's environmental study connects the property to Nashville's twin-tunnel airport corridor.
Read it
A LOOP Nashville review of the project’s 2025 environmental assessment found a mapped Broadway alignment extending from Centennial Park to the East Bank, including a specific Cumberland River crossing that engineers evaluated with roughly 25 feet of rock above the tunnel crown. The crossing is absent from The Boring Company’s current public route description.
Read it
The organization supported a downtown transportation tunnel in 2018. Its political relationships and competing transportation priorities deserve scrutiny alongside its criticism of Music City Loop.
Read opinionThe first routes establish a starting point—not an endpoint. New stations and branches could extend the network as neighborhoods, destinations, and private partners connect over time.
Explore every mapA practical guide to how the proposed system would work, how it could expand, and what still has to happen.
Read the complete Music City Loop guideElectric vehicles would carry small groups through dedicated underground tunnels, traveling directly between selected stations.
The publicly described first network links BNA, downtown, Lower Broadway, Capitol Hill, and the West End corridor.
Additional branches and stations could be added as neighborhoods, venues, employers, and private properties join the system.
The Boring Company says construction and operation will be privately funded, with public approvals still required.
A point-to-point network designed to reduce surface congestion and make trips between major Nashville destinations more predictable.
Engineering, environmental review, permits, station agreements, construction, testing, and future route announcements will shape the final system.
Get the latest reporting, maps, and project updates delivered to your inbox.